MSC Fire Engineering

Fire engineering for complex projects

A selection of our work across the UK. From early design through to completion, we've supported complex buildings, industrial facilities, and specialist developments.

Site engineer reviewing plans in front of a residential tower under construction
Belfast International Airport

Project 1

Sector: Airports

Belfast International Airport,Redevelopment Programme

MSC provided strategic fire safety support throughout Belfast International Airport's redevelopment programme.

The challenge

Delivering a major redevelopment programme within a live, operational airport, where passenger safety and day-to-day operations could not be compromised.

Our approach

Working closely with airport management, we provided comprehensive, practical fire safety advice at each stage of the programme. This included developing temporary fire strategies, carrying out dynamic risk assessments as conditions changed, and providing daily strategic support to allow works to progress safely alongside airport operations.

The outcome

The redevelopment works progressed with minimal operational disruption, and the airport remained safe and fully operational throughout.

The Grand Hotel, Brighton

Project 2

Sector: Heritage · Hotels

The Grand Hotel, Brighton

MSC provided specialist fire engineering consultancy for the large-scale refurbishment of Brighton's historic Grand Hotel.

The challenge

Delivering a practical, compliant fire safety solution for a working hotel, while respecting the building's significant historic character.

Our approach

Taking a considered, performance-based approach, we provided the technical expertise and engineering analysis needed to support the refurbishment. This allowed us to meet modern fire safety requirements while preserving the building's architectural and heritage features.

The outcome

The refurbishment was successfully completed with the hotel remaining open and fully operational throughout, keeping guests and staff safe while minimising disruption to the business.

Lidl Regional Distribution Centre, Belvedere

Project 3

Sector: Warehouses

Lidl RegionalDistribution Centre,Belvedere

MSC developed a detailed fire strategy for a 35,270m² regional distribution centre.

The challenge

The scale of the building resulted in long travel distances, requiring careful consideration of means of escape. The project also included the charging zone for lithium-ion battery-powered materials handling equipment, a technically complex risk not addressed by standard fire safety guidance.

Our approach

We carried out engineering analysis to justify the extended travel distances, demonstrating that occupants could evacuate safely without the need for additional escape routes. For the charging zone, we completed a specialist risk assessment and developed a bespoke set of fire safety provisions, drawing on FM Global data sheets, RISC Authority and FPA guidance along with industry publications.

The outcome

Our engineered approach allowed the building to operate more efficiently, making better use of the available space and keeping internal compartmentation to a minimum. This avoided unnecessary fire walls and barriers that would have restricted the movement of goods, staff and equipment across the distribution centre.

Leonardo Hotel Derby exterior at dusk

Project 4

Sector: Hotels · Façade remediation

Leonardo Hotel, Derby

MSC provided fire engineering consultancy to support PAS 9980 façade remediation works at the Leonardo Hotel in Derby.

The challenge

Developing a practical, compliant and proportionate solution to a complex cladding remediation brief.

Our approach

Working closely with the wider design team throughout, we provided the technical expertise and engineering analysis needed to shape a risk-based remediation strategy in line with PAS 9980.

The outcome

A proportionate remediation solution that addressed the genuine fire risk, giving the client confidence that the works were both necessary and sufficient, without unnecessary cost or disruption.

Expertise

Our Approach

Early-stage design support

Early-stage design support

Guidance from concept through planning.

Compliance and approvals

Compliance and approvals

Strategy and documentation for building control and statutory consultees.

Advanced modelling and analysis

Advanced modelling and analysis

Smoke movement, egress, and performance-based design.

Construction stage inspections

Construction stage inspections

On-site verification and sign-off.

Forensic analysis and investigation

Forensic analysis and investigation

Post-incident assessment and expert reporting.

Ready to discuss your project?

Speak with our team about your fire engineering and safety consultancy needs.

Discuss your project